上海金沙国际平台登录_js9905com金沙网站
电话:021-64683698
传真:021-64683698
邮箱:shang--rong@163.com
公司地址:上海市徐汇区中山南二路158号
工厂地址:上海市奉贤区青村镇品星路278号
上海金沙国际平台登录_js9905com金沙网站
电话:021-64683698
传真:021-64683698
邮箱:shang--rong@163.com
公司地址:上海市徐汇区中山南二路158号
工厂地址:上海市奉贤区青村镇品星路278号
The main description
This equipment is a hot mold plastic welding system, automatic control complete hot mold plastic parts mold heating welding etc.. Column guide sleeve control up and down movement and positioning by a cylinder guide up and down, before and after the control cylinder plus square guide the precise location before and after exercise. Welding principle mainly through a heating plate is composed of temperature control for welding plastic parts. When welding, the heating plate is arranged between the two plastic pieces, when the workpiece to live close to the heating plate, the plastic melts. In a pre-set heating time has elapsed, the workpiece surface molten plastic will reach a certain degree, this time on both sides of the workpiece to separate, the heating board is removed, then the two pieces of the workpiece and together, when the hot plate to stop the action, let the pressure for a few seconds, the solidification molding, thus forming a strong molecular chain, achieve the purpose of welding, welding strength can transcend from the raw material strength, complete the whole welding process.